Prima Contact Harta
 Română  English
 
 
Prima / Noutati
Noutati
ianuarie   februarie   martie   aprilie   mai   Iunie   Iulie   august   septembrie   octombrie   noiembrie   decembrie
 
17.08.2011 Ballast Nedam supplies heavy lift vessel Svanen to London Array
Engineering major Ballast Nedam is to supply its heavy lift vessel Svanen at the London Array Offshore Wind Farm from towards the end of August.
Accesări: 1215
 
16.08.2011 Ming Yang sees orders increase but net profit slip
Chinese wind turbine manufacturer the Ming Yang Wind Power Group (MY Wind) has recorded revenues of RMB1,405m ($217.4m) for the second quarter of 2011, a 7.2 per cent increase on the same period last year when the figure was RMB 1,310m ($205m). Gross profit for three months was RMB267m ($41.3m), a 7.3 per cent increase compared with the second quarter of 2010 level of RMB249.1m ($39m).
Accesări: 1190
 
16.08.2011 Dong sells off 50% stake in Nordkraft Vind
Danish power company Dong Energy has sold its 50 per cent stake in Norwegian wind developer Nordkraft Vind for NOK145m ($26.5m) to Nordkraft Produksjon. Dong said the size of its operation in Norway no longer requires a strategic focus on expansion in that market.
Accesări: 1997
 
16.08.2011 Pornirea turbinelor eoliene de la Fantanele a adus divizia romana de productie si trading a CEZ pe profit
Multumita faptului ca a pornit turbinele eoliene de la Fantanele, divizia de productie si trading de energie a grupului ceh CEZ a inregistrat, in primul semestru, un profit EBITDA de 24,6 milioane euro, in Romania, comparativ cu o pierdere de circa 4 milioane euro in aceeasi perioada a anului trecut, relateaza Mediafax.
Accesări: 699
 
15.08.2011 Vestas picked by E.ON to supply 112 turbine for US wind farm
Danish wind giant Vestas has received an order for turbines with a combined capacity of 202MW from E.ON Climate & Renewables North America. The project name and location has not yet been disclosed but the order is for 112 turbines each with a 1.8MW capacity.
Accesări: 1031
 
15.08.2011 Noble Foods gets go-ahead for on-site turbine in Scotland
UK-based egg supplier Noble Foods has received planning permission to install a 110 metre, 1.5MW wind turbine on land at its agriculture, milling and packing centre in Fife, east Scotland. The project is being developed and installed by micro generation specialist Wind Direct and has been granted conditional approval by the local authority.
Accesări: 1075
 
15.08.2011 China to double solar facilties by end of 2011
China is set to double its solar capacity to 2GW by the end of the year as the world’s largest producer of modules encourages an increase in domestic installations through a new feed-in tariff.
Accesări: 1015
 
15.08.2011 Doua parcuri eoliene, inaugurate in 2012, la Constanta si Galati
Furnizorul si distribuitorul de electricitate Electrica SA estimeaza ca la sfarsitul anului 2012 va pune in functiune cele doua parcuri eoliene pe care le construieste la Chirnogeni (judet Constanta) si Frumusita (judet Galati).
Accesări: 776
 
12.08.2011 Solarig surpasses 105MW of PV in Europe
Spanish photovoltaic (PV) company Solarig has so far invested €65m in 2010 into 21MW of solar projects in Italy, Spain and France. Cumulative investment is now more €400m and the company has now connected 105MW of PV projects in Europe.
Accesări: 1053
 
12.08.2011 SMA Solar’s first half sales down by €100m
German photovoltaic (PV) manufacturer SMA Solar has recorded first half sales of €715m, €100m less than the same period last year. Consolidated net profit in the first six months was down by more than 50 per cent as the company recorded net profit of €73.5m, compared with €158.2m in 2010. SMA generated EBIT of €103.7m, a significant reduction from last year’s figure of €219.9m which was a record period for the company.
Accesări: 1293
 
12.08.2011 Bridgepoint acquires €596.5m Spanish wind energy portfolio
UK private equity firm Bridgepoint has announced it will acquire wind energy assets from listed Spanish construction conglomerate ACS, in a deal which will value the portfolio at €596.5m.
Accesări: 1098
 
11.08.2011 Solar company Conergy sees margins squeezed in Q1
German solar company Conergy has reported second quarter sales of €225.2m, a 40 per cent increase on the first quarter but a decrease compared to the same period in 2010 when sales were €239.4m.
Accesări: 1051
 
11.08.2011 Iberdrola surpasses 8GW of renewable projects in Europe
Spanish energy company Iberdrola has commissioned wind farms in Poland and Cyprus with a combined capacity of 40MW. It has now installed 8GW of renewable facilities in Europe and 13GW globally.
Accesări: 1205
 
11.08.2011 Cea mai mare centrala de energie solara din Europa se deschide in Ucraina
Cea mai mare centrala de energie solara din Europa se va deschide in Ucraina pana la sfarsitul anului, avand o capacitate de 100 de megawati-ora pe an.
Accesări: 742
 
10.08.2011 SunPower sees rise in net loss but gets credit lifeline from Total
US solar power manufacturer SunPower has announced a sharp rise in net loss for the second quarter of 2011 but said it has secured significant line of credit from acquirer France’s Total.
Accesări: 1231
 
10.08.2011 AEG receives order for 5MW project in India
Energy component manufacturer AEG has been contracted by India-based Surana Ventures to provide electrical systems including inverters, monitoring and measuring equipment for a 5MW solar plant in Gujarath, west India. Since March, AEG has had orders in the country for projects with a combined capacity of 25MW.
Accesări: 1240
 
10.08.2011 Parcul eolian Petrom de la Dorobantu, aproape de finalizare
Petrom a anuntat, miercuri, in raportul semestrial al companiei, ca 13 din cele 15 turbine eoliene ale parcului de la Dorobantu au fost ridicate.
Accesări: 679
 
10.08.2011 Targul Renexpo ® South - East Europe, in noiembrie la Bucuresti
Cea de a patra editie a Renexpo ® South - East Europe, cel mai important eveniment din domeniul energiei regenerabile in Romania, se va organiza la Sala Palatului din Bucuresti in perioada 9-11 noiembrie 2011.
Accesări: 724
 
09.08.2011 Vestas receives 92MW turbine order in Spain
Global energy company Vestas has been contracted to supply wind turbines with a capacity of 92MW for two wind projects in the north of Spain by subsidiaries of the Vapat group Bruilles Eolica and Cyl Energia Eolica.
Accesări: 1095
 
09.08.2011 nkt cables contracted by 50Hertz to connect Baltic 2 offshore wind farm
Danish transmission specialist nkt cables has been contracted by German energy company 50Hertz to install high voltage subsea cables for the Baltic 2 offshore wind farm. The deal is valued at DKK750m (€95m) and equipment for the project will be manufactured at a facility in Cologne.
Accesări: 1199
 
Pagina:
«« 1 2 3 4 »»
Prima   Contact   Harta
vizitatori: 851461
sus
B2B and B2C solutions , Branding & Graphic Design Services,Website Design and Development , E-Commerce Systems,Software Application Architecture and Development,Multimedia solutions , 2D/3D modeling & animation solutions,Video & Post Production Creat de Trimaran
 
Profilul energetic al tarii   /   Cadrul legislativ   /   Studii de caz   /   Profiliurile INP/CN   /   Planuri de afaceri   /   Constientizare   /   Publicaţii   /   Noutati
Tel. +373 22 232247   /  Fax. +373 22 232247

Adresa: Str. Mitropolit Dosoftei 156a, bir. 37, mun. Chisinau, Republica Moldova