Prima Contact Harta
 Română  English
 
 
Prima / Noutati / Former employee confesses to wind farm hacking: report
Former employee confesses to wind farm hacking: report
18.04.2011  
Accesări: 1184   
imprimare
http://www.newenergyworldnetwork.com/renewable-energy-news/former-employee-confesses-to-wind-farm-hacking-report.html

A former employee of NextEra Energy Resources has laid claim to a break-in at a wind farm control centre in a revenge incident.

The hacker reportedly revealed details of his alleged break-in during an email interview with Computerworld.
He is thought to have accessed the control centre for the Fort Sumner wind farm in New Mexico, which consists of 136 wind turbines.
He said he was able to make his way into the wind farm’s control hub due to a weakness in the installed security software.
He allegedly hacked into the SCADA system that controls the wind turbines in order to show up the energy company.
A hacker meddling with the control system of the wind farm would potentially be able to programme the wind turbines for failure.
Although no problems have been reported at the wind farm so far, reports suggest that the suspect may be arrested.

Plasează articolul în:
google Delicious Digg Yahoo Facebook Twitter Netvibes linkedin
 
 
Prima   Contact   Harta
vizitatori: 966562
sus
B2B and B2C solutions , Branding & Graphic Design Services,Website Design and Development , E-Commerce Systems,Software Application Architecture and Development,Multimedia solutions , 2D/3D modeling & animation solutions,Video & Post Production Creat de Trimaran
 
Profilul energetic al tarii   /   Cadrul legislativ   /   Studii de caz   /   Profiliurile INP/CN   /   Planuri de afaceri   /   Constientizare   /   Publicaţii   /   Noutati
Tel. +373 22 232247   /  Fax. +373 22 232247

Adresa: Str. Mitropolit Dosoftei 156a, bir. 37, mun. Chisinau, Republica Moldova