Prima Contact Harta
 Română  English
 
 
Prima / Noutati / Amherst mulls BlueWave Capital solar contract
Amherst mulls BlueWave Capital solar contract
21.03.2011  
Accesări: 1051   
imprimare
http://www.newenergyworldnetwork.com/renewable-energy-news/by-technology/solar/amherst-mulls-bluewave-capital-solar-contract.html

Boston-based renewable energy developer BlueWave Capital is reportedly about to enter negotiations with the town of Amherst to construct a solar project that could meet most of the municipality’s power needs.

The town is said to be mulling over a solar installation that could save it $25m in energy costs over the next 30 years.
Amherst town head John Mustante is expected to enter talks with the renewable power developer imminently over the potential large-scale installation of solar by early 2012.
He is expected to give the green light to a 4.75MW photovoltaic array at a landfill site in Amherst that BlueWave estimates will cut the town’s carbon emissions by 6,000 tons each year.
The solar installation would need to secure a state permit from the Department of Environmental Protection and local permits before it can go ahead.
The town is expected to convene to discuss entering a long-term contract with BlueWave within the next few months.


Plasează articolul în:
google Delicious Digg Yahoo Facebook Twitter Netvibes linkedin
 
 
Prima   Contact   Harta
vizitatori: 966871
sus
B2B and B2C solutions , Branding & Graphic Design Services,Website Design and Development , E-Commerce Systems,Software Application Architecture and Development,Multimedia solutions , 2D/3D modeling & animation solutions,Video & Post Production Creat de Trimaran
 
Profilul energetic al tarii   /   Cadrul legislativ   /   Studii de caz   /   Profiliurile INP/CN   /   Planuri de afaceri   /   Constientizare   /   Publicaţii   /   Noutati
Tel. +373 22 232247   /  Fax. +373 22 232247

Adresa: Str. Mitropolit Dosoftei 156a, bir. 37, mun. Chisinau, Republica Moldova